Pavilion Slab and Doors Project 15,700 square foot slab with a slight pitch of 18” in 157’ to allow each pew to be slightly higher than the one in front. A “diamond” was formed and the concrete left out at each column to allow the columns to be jacked up, temporarily shored, and column bases poured underneath. Pressure treated, beveled 2 xs where installed to allow pews to be temporarily fastened to the slab. Exterior concrete apron and grading. 21 overhead doors and 8 A.D.A. complaint storefront doors will be installed. Please use the drop-down above to log-in to the Pavilion Slab and Doors Project using the ID and PASS provided by Murray Brothers Construction, Inc. Please contact us @ (978) 537-5700 if you misplaced and/or require an ID and PASS to review your project status.
|
|||||
|
|
||||||